Office and Retail Signage in Dubai: A Shopfront on Handover Week

Handover week in a new unit is noisy and short. Flooring is going down, the shopfitter wants the keys back, and the sign is usually the last thing to arrive and the first thing anyone photographs. Office and retail signage in Dubai is planned backwards from that week, because the sign cannot be made until several other people have finished.

No prices online, a firm quote within the hour Free prepress check Delivered across all seven emirates
Office & Retail Signage printed in Dubai
One quote for the whole range Signage
Before it reaches you

What happens to your order before it reaches you.

Five steps, from the brief you send us to the moment it is in place.

01

The Fascia Is Measured on Site

We measure the actual fascia instead of working from the lease drawing. Units are rarely built to the millimetre, and a sign cut to the drawing can end up with an uneven margin at one end that nobody can unsee.

02

The Landlord Pack Goes In Early

Mall and tower landlords approve signage before fabrication. The pack shows dimensions, materials, fixings and illumination. Submitting this in the first week of a fit out is the single best thing a tenant can do for their opening date.

03

Interior Pieces Are Made Alongside

Reception lettering, door vinyls, a directory plate and the back of house notices are produced in the same run as the fascia. Doing them together is what makes a unit look like one brand instead of four suppliers.

04

Install Happens Out of Hours

Most centres only allow signage work overnight or before opening. We schedule to the centre's rules, which is why the install date is often fixed by the landlord and not by us.

05

Opening Day

The film comes off the letters, the lighting is set, and we take the rubbish with us. You get the drawings and the specification for any later repair.

We would rather lose the job than hide this. If the landlord approval has not been submitted, no amount of paying extra will make a compliant shopfront sign appear in three days. The fabrication is quick. The permission is not. Related: illuminated letters, window branding, and name plates. One more thing gets decided in that week and then lives with you for years. The height of the lettering sets how far back the unit reads from, and in a mall that distance is usually the width of the walkway plus the shop opposite. We work it out on site with you.

Office & Retail Signage questions

Quick answers.

As soon as the lease is signed, so approval can start.

Yes, and most malls require it.

Yes. Send the guide and we build to it.

WhatsApp an estimator