Hanging Signage in Dubai
Office & Retail Signage
Office & Retail Signage

Hanging Signage in Dubai: Signs That Live in the Air

When the walls are glass, too far away or already full, the only space left is overhead. Hanging signage in Dubai is suspended from ceilings, soffits and structure, and it solves a problem no wall mounted sign can in an open plan floor or a wide retail space.

No prices online, a firm quote within the hour Free prepress check on every file Delivered across all seven emirates
Material
Lighting
Installation
Turnaround
Usually 5–10 working days
Your brief

Material: Acrylic · Lighting: Unlit · Installation: Supply and install

An estimator replies with a firm, VAT-inclusive price and a production date.
How it's made

From your file to the finished job.

Six steps happen between the brief and the finished job. Here they are, in the order they happen on our floor in Dubai South.

01 / 06

What It Hangs From Is the First Question

A suspended ceiling grid carries very little. Anything of weight goes to the slab or the structure above, which means the fixing is agreed with the building before the sign is designed.

02 / 06

Both Faces Are Seen

People walk past on both sides, so a hanging sign is almost always double sided. On a single sided panel, half the audience sees a blank back, which is the most common fault we are asked to correct.

03 / 06

Height Clears the Traffic

High enough that nobody walks into it, low enough to be read without looking straight up. In a retail aisle that window is narrower than it sounds, and it is set on site.

04 / 06

It Needs to Stop Moving

Air conditioning turns a lightly hung panel into a slowly rotating one. Two wires spaced apart instead of one in the centre, and a little weight at the bottom, holds it still.

05 / 06

Material Is Chosen for Weight

Lightweight composite, foam board or fabric in a frame. The lighter the panel, the simpler the fixing and the less the building has to carry, so weight drives the material choice more than finish does.

06 / 06

Installed to a Set Height

Wires are cut to length so every sign in a run hangs at exactly the same level, which is immediately obvious down a long aisle if it is not done. We set the first sign, measure it, and cut the rest to match that single reference.

The constraint that decides many of these jobs is access. Fitting at height over a trading floor needs a platform and usually out of hours work, and that access cost can exceed the sign. Worth knowing before the design grows.

Related: vertical signage, D-ring banners, and office and retail signage.

Specifications

What you get.

Material
Acrylic · Aluminium composite (ACP) · Stainless steel · Wood
Lighting
Unlit · Illuminated
Installation
Supply and install · Supply only
Turnaround
Usually 5–10 working days
Proof
A digital proof before anything prints
Delivery
All seven emirates, or collect from Dubai South
On every order

What every order includes

  • A free prepress check on your file
  • A digital proof before anything prints
  • One VAT-inclusive quote with a production date
  • Delivery to all seven emirates, or collection from Dubai South
Files we take PDF · AI · EPS · SVG · PSD · JPG
Artwork guide

Setting up your file.

  • 01
    Send the logo as a vectorLetters and shapes are cut from your outlines, so we need AI, EPS, SVG or PDF, not a screenshot or a JPEG.
  • 02
    Measure the real spaceWidth, height and a straight-on photo of the wall or fascia. The tape measure often disagrees with the drawing.
  • 03
    Send names as textFor plates and directories, send names and titles in a document, so nothing is retyped from an image.
  • 04
    Tell us about power and the wallFor lit signs, where the nearest power point is. For every sign, what the wall is made of.
Hanging Signage questions

Quick answers.

Only very light panels. Weight goes to the slab.

Double, almost always.

Not on two spaced wires with a little weight.

WhatsApp an estimator