Pylon & Unipole Signage in Dubai
Large Format & Panel Signs
Large Format & Panel Signs

Pylon and Unipole Signage in Dubai: A Sign With Foundations

A pylon sign is a structure before it is a sign. One or two steel columns go into the ground, a cabinet sits on top, and the whole thing has to stand in wind for twenty years. Pylon and unipole signage in Dubai begins with a hole and a concrete pour, not with artwork.

No prices online, a firm quote within the hour Free prepress check on every file Delivered across all seven emirates
Board
Location
Installation
SizeWidth × height in metres
Turnaround
Usually 2–5 working days; structures are scheduled with your quote
Your brief

Board: Forex (PVC foam board) · Location: Indoor · Installation: Supply only

An estimator replies with a firm, VAT-inclusive price and a production date.
How it's made

From your file to the finished job.

Six steps happen between the brief and the finished job. Here they are, in the order they happen on our floor in Dubai South.

01 / 06

The Foundation Is Sized to the Sign

Height, face area and local wind loading set the depth and volume of the concrete base. This is calculated, not estimated, and on a tall unipole the foundation is a substantial piece of civil work in its own right.

02 / 06

Services Have to Be Found First

Before anything is excavated, the position is checked against drainage, power and communications runs. Discovering a cable at a metre down stops the job and moves the sign, so this is done at survey.

03 / 06

The Column Goes Up in One Lift

The post is craned into the prepared base and held while it sets, plumb in both directions. A pylon a degree off vertical is visible from a long way down the road and cannot be corrected afterwards.

04 / 06

The Cabinet Is Built Separately

Faces, lighting and internal frame are assembled in the workshop and lifted onto the column as a unit. Access panels are positioned so a face can be changed from a platform without dismantling anything.

05 / 06

Faces Are Usually Flex or Acrylic

Tensioned flex faces suit large cabinets and can be replaced cheaply. Acrylic gives a crisper result at smaller sizes. Both are serviceable from the front with the right access.

06 / 06

Maintained From the Ground

Lighting gear and drivers are placed in an accessible base compartment wherever the design allows, so routine work does not need a platform. Over the life of a pylon that one decision saves more than it costs, since hiring access for a failed driver is the expensive part of any repair.

Worth saying plainly: this is the longest lead time of anything we make. Structural design, permissions, excavation and a crane all have to line up, and the printing is the quickest part of it by a wide margin.

Related: billboard signboards, outdoor directory signage, and signage.

Specifications

What you get.

Board
Forex (PVC foam board) · Foam board · Aluminium composite (ACP) · Flex face
Location
Indoor · Outdoor
Installation
Supply only · Installed by our team
Size
Made to your width and height
Turnaround
Usually 2–5 working days; structures are scheduled with your quote
Proof
A digital proof before anything prints
Delivery
All seven emirates, or collect from Dubai South
On every order

What every order includes

  • A free prepress check on your file
  • A digital proof before anything prints
  • One VAT-inclusive quote with a production date
  • Delivery to all seven emirates, or collection from Dubai South
Files we take PDF · AI · EPS · SVG · PSD · JPG
Artwork guide

Setting up your file.

  • 01
    Send the logo as a vectorLetters and shapes are cut from your outlines, so we need AI, EPS, SVG or PDF, not a screenshot or a JPEG.
  • 02
    Measure the real spaceWidth, height and a straight-on photo of the wall or fascia. The tape measure often disagrees with the drawing.
  • 03
    Send names as textFor plates and directories, send names and titles in a document, so nothing is retyped from an image.
  • 04
    Tell us about power and the wallFor lit signs, where the nearest power point is. For every sign, what the wall is made of.
Pylon & Unipole Signage questions

Quick answers.

Weeks, driven by permissions and civil work.

Yes, from the front with platform access.

Yes, engineered and poured as part of the job.

WhatsApp an estimator