Double Decker Stands in Dubai
Exhibition Stands
Exhibition Stands

Double Decker Stands in Dubai: Buying Floor Space Upwards

A double decker buys you a second floor on the same pitch. Double decker stands in Dubai are how companies get a private meeting area at a crowded show without paying for twice the floor, and they are the most heavily regulated thing we build.

No prices online, a firm quote within the hour Free prepress check on every file Delivered across all seven emirates
Your brief

Double Decker Stands: tell us the size, the quantity and the date you need it by.

An estimator replies with a firm, VAT-inclusive price and a production date.
How it's made

From your file to the finished job.

Six steps happen between the brief and the finished job. Here they are, in the order they happen on our floor in Dubai South.

01 / 06

The Venue Decides If You Can

Height limits, permitted locations and total load are all set by the hall. Some pitches allow two storeys and some do not, and that is confirmed before a design is started.

02 / 06

It Needs Structural Sign Off

Two storey stands require engineered drawings and approval from the venue's own structural reviewer. That process has a fixed duration and it is the long pole in every double decker programme.

03 / 06

The Staircase Eats the Ground Floor

A compliant staircase takes a surprising amount of the lower level, and it has to land somewhere that does not block the aisle. The stair position is usually the first thing fixed in the layout.

04 / 06

Upstairs Is for Meetings

The upper deck is almost always a private area, away from the noise. Downstairs stays open for traffic, which is the whole reason for the arrangement.

05 / 06

Build Time Is Longer

Two storeys take more than one night. Venues issue extended build up slots for them, and that needs requesting early alongside the structural submission.

06 / 06

Engineered, Built and Certified

We produce the drawings, obtain the approvals and supply the certification the venue requires at handover. Budget for the approval process as a line of its own. Structural review, engineered drawings and an extended build slot all carry cost before a single component is cut, and they are the part most often left out of an initial estimate entirely by other suppliers. Ask for them to be itemised separately in any quotation you compare.

We will say this plainly at the first meeting: if you have not confirmed that your pitch permits a second storey, nothing else about the design matters. That answer comes from the organiser and it comes before anybody draws anything.

Related: custom exhibition stands, double decker booths, and exhibition and event branding.

Specifications

What you get.

Turnaround
Book at least three weeks before your show
Proof
A digital proof before anything prints
Delivery
All seven emirates, or collect from Dubai South
On every order

What every order includes

  • A free prepress check on your file
  • A digital proof before anything prints
  • One VAT-inclusive quote with a production date
  • Delivery to all seven emirates, or collection from Dubai South
Files we take PDF · AI · EPS · SVG · PSD · JPG
Artwork guide

Setting up your file.

  • 01
    Work at full size or to scaleBuild the file at full size, or at a stated scale such as 1:10 when the canvas gets too big, and tell us the scale.
  • 02
    Match resolution to distanceSomething read from a few metres away needs far less resolution than a business card. Around 100 dpi at full size is usually plenty.
  • 03
    Tell us how it will be fixedHems, eyelets, pole pockets and frames take up material around the edge. Tell us the fixing and prepress allows for it.
  • 04
    Send logos as vectorsAI, EPS, SVG or PDF keeps edges sharp at large sizes. Embed or outline the fonts.
Double Decker Stands questions

Quick answers.

No. The venue and the pitch decide.

Yes, drawings, approval and certification.

More than one night. Extended slots are requested early.

WhatsApp an estimator